Renovation Cost Calculator
Build a renovation budget with editable project scope, finish level, labor, and contingency.
Preparing your calculator…
How this calculator works
Project-specific low, expected, and high base rates per square foot are multiplied by area, finish, and scope. The base cost is split into materials and labor; the labor approach adjusts only labor. Selected relevant upgrades add configurable allowances. Demolition and permit allowances are added, then contingency applies to the subtotal. Assumptions live in data/renovation-costs.ts and require local review.
What to enter
Choose the project type, floor or surface area, finish, scope, labor approach, relevant additions, and contingency. Exterior painting and roofing use the relevant surface area rather than interior floor area.
What affects the estimate
The editable MansionMath planning rates differ by scope and finish; regional labor, availability, taxes, hidden damage, and design work are not local quote data.
Common estimating mistakes
Avoid adding an allowance for work already fully included in another budget line. A broad cost range is not a detailed bill of quantities or contractor bid.
Use current quotes, local rates, and measured dimensions to make this estimate useful for your situation.
Frequently asked questions
Is this a contractor quote?+
No. Rates are transparent MansionMath planning assumptions. Local bids, labor availability, product selections, permits, and hidden conditions can produce different totals.
How much contingency should I keep?+
The tool offers 5%, 10%, 15%, and 20%. Older properties and structural changes may need more reserve. Contingency is applied after selected extras and permits.
How should I use contingency?+
Keep it visible as a separate allowance for uncertainty. The offered percentages are planning choices, not a guarantee that unexpected work will be covered.
When should I request contractor quotes?+
Use the estimate to define scope first, then obtain comparable itemized bids before committing to work. Check which materials, permits, preparation, and exclusions each bid includes.